Instrumentation monitoring for highway fill construction at Iosegun River crossing, Highway 43, northern Alberta
K Li, R Skirrow
In the proceedings of: GeoNiagara 2022: 55th Canadian Geotechnical and 3rd Joint IAH-CNC and CGS Groundwater Specialty ConferencesSession: SESSION / SÉANCE 6: SITE INVESTIGATION AND MONITORING / ÉTUDE DE SITE ET SURVEILLANCE
Submit a Data Update Form for this paper
Please include this code when submitting a data update via other methods: GEO2002_41
Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.
Cite this article:
Li, K, Skirrow, R (2002) Instrumentation monitoring for highway fill construction at Iosegun River crossing, Highway 43, northern Alberta in GEO2002. Ottawa, Ontario: Canadian Geotechnical Society.
@inproceedings{Li_GEO2002_41,
author = {{Li, K}, {Skirrow, R}}
title = {Instrumentation monitoring for highway fill construction at Iosegun River crossing, Highway 43, northern Alberta}
booktitle = {Proceedings of the 55th Canadian Geotechnical and 3rd Joint IAH-CNC and CGS Groundwater Specialty Conferences}
year = {2002}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }
title = {Instrumentation monitoring for highway fill construction at Iosegun River crossing, Highway 43, northern Alberta}
booktitle = {Proceedings of the 55th Canadian Geotechnical and 3rd Joint IAH-CNC and CGS Groundwater Specialty Conferences}
year = {2002}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }
