EN FR

Mining in the Continuous Permafrost: Construction and Instrumentation of Two Large-Scale Waste Rock Piles

David Blowes, Michael Moncur, Leslie Smith, Dave Sego, Renata Klassen, Matt Neuner, Lianna Smith, Andrew Gravie, Douglas Gould, Jeff Reinson

In the proceedings of: GeoVancouver 2006: 59th Canadian Geotechnical Conference and the 7th Joint CGS/IAH-CNC Groundwater Conference

Session: T4-A Mining Geotechnique I - Case Histories and Cold Regions (CGS Special Session)

Submit a Data Update Form for this paper
Please include this code when submitting a data update via other methods: GEO2006_3150

Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.

Cite this article:
Blowes, David, Moncur, Michael, Smith, Leslie, Sego, Dave, Klassen, Renata, Neuner, Matt, Smith, Lianna, Gravie, Andrew, Gould, Douglas, Reinson, Jeff (2006) Mining in the Continuous Permafrost: Construction and Instrumentation of Two Large-Scale Waste Rock Piles in GEO2006. Ottawa, Ontario: Canadian Geotechnical Society.

@inproceedings{Blowes_GEO2006_3150, author = {{Blowes, David}, {Moncur, Michael}, {Smith, Leslie}, {Sego, Dave}, {Klassen, Renata}, {Neuner, Matt}, {Smith, Lianna}, {Gravie, Andrew}, {Gould, Douglas}, {Reinson, Jeff}}
title = {Mining in the Continuous Permafrost: Construction and Instrumentation of Two Large-Scale Waste Rock Piles}
booktitle = {Proceedings of the 59th Canadian Geotechnical Conference and the 7th Joint CGS/IAH-CNC Groundwater Conference}
year = {2006}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }
Abstracts are Copyright © the Authors and used with permission. Online database Copyright © 2026 The Canadian Geotechnical Society. All rights reserved.