Pile loading tests at Golden Ears Bridge
Ali Amini, Bengt H Fellenius, Makram Sabbagh, Ernest Naesgaard, Michael Buehler
In the proceedings of: GeoEdmonton '08: 61st Canadian Geotechnical Conference and the 9th Joint CGS/IAH-CNC Groundwater ConferenceSession: M1A Pile Foundations and Load Testing
Submit a Data Update Form for this paper
Please include this code when submitting a data update via other methods: GEO2008_5
Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.
Cite this article:
Amini, Ali, Fellenius, Bengt H, Sabbagh, Makram, Naesgaard, Ernest, Buehler, Michael (2008) Pile loading tests at Golden Ears Bridge in GEO2008. Ottawa, Ontario: Canadian Geotechnical Society.
@inproceedings{Amini_GEO2008_5,
author = {{Amini, Ali}, {Fellenius, Bengt H}, {Sabbagh, Makram}, {Naesgaard, Ernest}, {Buehler, Michael}}
title = {Pile loading tests at Golden Ears Bridge}
booktitle = {Proceedings of the 61st Canadian Geotechnical Conference and the 9th Joint CGS/IAH-CNC Groundwater Conference}
year = {2008}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }
title = {Pile loading tests at Golden Ears Bridge}
booktitle = {Proceedings of the 61st Canadian Geotechnical Conference and the 9th Joint CGS/IAH-CNC Groundwater Conference}
year = {2008}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }
