Design and Construction of a Seepage Cut Off Wall Using The Slurry Trench Technique in Cold Temperatures at the Horizon Dam Project
LA Barr, JC Sobkowicz
In the proceedings of: GEO2010 Calgary: 63rd Canadian Geotechnical Conference & 6th Canadian Permafrost ConferenceSession: Oil Sands Geotechnology II
Submit a Data Update Form for this paper
Please include this code when submitting a data update via other methods: GEO2010_95
Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.
Cite this article:
Barr, LA, Sobkowicz, JC (2010) Design and Construction of a Seepage Cut Off Wall Using The Slurry Trench Technique in Cold Temperatures at the Horizon Dam Project in GEO2010. Ottawa, Ontario: Canadian Geotechnical Society.
@inproceedings{Barr_GEO2010_95,
author = {{Barr, LA}, {Sobkowicz, JC}}
title = {Design and Construction of a Seepage Cut Off Wall Using The Slurry Trench Technique in Cold Temperatures at the Horizon Dam Project}
booktitle = {Proceedings of the 63rd Canadian Geotechnical Conference & 6th Canadian Permafrost Conference}
year = {2010}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }
title = {Design and Construction of a Seepage Cut Off Wall Using The Slurry Trench Technique in Cold Temperatures at the Horizon Dam Project}
booktitle = {Proceedings of the 63rd Canadian Geotechnical Conference & 6th Canadian Permafrost Conference}
year = {2010}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }