Basal Heave in a Three-Level Underground Parkade: A Case Study in Winnipeg, Manitoba
Isaac Dennett, Brad Wiebe, Gil Violette, Kelly Johnson
In the proceedings of: GeoManitoba 2025: 78th Canadian Geotechnical Conference & 9th Canadian Permafrost ConferenceSession: Soil Mechanics & Foundations 3
ABSTRACT: The Winnipeg Square Parkade, a three-level underground structure located at 360 Main Street in Winnipeg, Manitoba, was designed and constructed in the mid to late 1970’s. Since construction, the slab on grade floor across the lower level (P3) of the parkade heaved, resulting in reduced vertical clearance for vehicles. In preparation for the opening of the 300 Main Street tower development, the feasibility and risks associated with lowering the P3 parkade slab were assessed and a depressurization system was selected to lower porewater pressures and reduce the risk of basal heave both during and post construction. Four depressurization wells were advanced into the bedrock underlying the parkade. Site constraints required the depressurization wells to be installed from inside the parkade with a limited access drill rig. Implementation of the depressurization system successfully reduced the risk of basal heave, allowing for the parkade slab to be lowered.
RÉSUMÉ: Le parc de stationnement souterrain Winnipeg Square, une structure de trois niveaux située au 360 rue Main à Winnipeg (Manitoba), a été conçu et construit entre le milieu et la fin des années 1970. Après la construction, la dalle sur sol du niveau inférieur (P3) a subi un soulèvement, entraînant une réduction du gabarit vertical disponible pour les véhicules. En vue de l’ouverture du nouvel immeuble situé au 300 rue Main, la faisabilité ainsi que les risques associés à l’abaissement de la dalle du niveau P3 ont été évalués. Un système de dépressurisation a été retenu afin de diminuer les pressions interstitielles et de réduire le risque de soulèvement de la base durant et après les travaux. Quatre puits d’assèchement ont été forés dans le substratum rocheux sous-jacent au parc de stationnement. En raison des contraintes d’accès, les forages ont été réalisés depuis l’intérieur du parc de stationnement à l’aide d’une foreuse compacte. La mise en œuvre du système de dépressurisation a permis de maîtriser efficacement le risque de soulèvement basal, rendant possible l’abaissement sécuritaire de la dalle.
Georeferenced information:
Submit a Data Update Form for this paper
Please include this code when submitting a data update via other methods: GEO2025_242
Access this article:
Canadian Geotechnical Society members can access to this article, along with all other Canadian Geotechnical Conference proceedings, in the Member Area. Conference proceedings are also available in many libraries.
Cite this article:
Dennett, Isaac, Wiebe, Brad, Violette, Gil, Johnson, Kelly (2025) Basal Heave in a Three-Level Underground Parkade: A Case Study in Winnipeg, Manitoba in GEO2025. Ottawa, Ontario: Canadian Geotechnical Society.
@inproceedings{Dennett_GEO2025_242,
author = {{Dennett, Isaac}, {Wiebe, Brad}, {Violette, Gil}, {Johnson, Kelly}}
title = {Basal Heave in a Three-Level Underground Parkade: A Case Study in Winnipeg, Manitoba }
booktitle = {Proceedings of the 78th Canadian Geotechnical Conference & 9th Canadian Permafrost Conference}
year = {2025}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }
title = {Basal Heave in a Three-Level Underground Parkade: A Case Study in Winnipeg, Manitoba }
booktitle = {Proceedings of the 78th Canadian Geotechnical Conference & 9th Canadian Permafrost Conference}
year = {2025}
organization = {The Canadian Geotechnical Society},
address = {Ottawa, Canada} }